Step 2: Review Product Page

Changing Places 2

Changing Place Restrooms include essential floorspace for two carers access to hoists and automated adult change table to assist care for people with disability and high support needs.

Specification

  • Wall Framing

    Fully welded robust steel SHS, hot dip galvanized after fabrication
  • Proprietary Prefab Wall Panel System

    Pre-clad panels, inside and out. Doors pre-hung in frames. Prefab for simple, fast and accurate bolt together onsite construction
  • External Wall Cladding

    • Alum Extruded Cladding (standard)
    • Vinyl Graphics
  • Internal Wall Cladding

    Miniorb - vandal resistant and easy maintenance
  • Roof

    Insulated roof panel
  • Door

    Solid core, Colorbond clad
  • Door Hardware

    Heavy duty marine grade stainless steel, indicator bolts, door closers, internal and external pull handles
  • Door Signage

    Changing Places compliant door signage
  • Fixings

    Class 3 roof fixings, stainless steel structural fixings
  • Structural Engineering

    Engineered for your site, including Region D cyclonic locations
  • Standard Fixtures

    Changing Places compliant fixtures, relevant to selected design
  • Optional Extras

    • Solar lighting
    • Auto-timed door locking
    • Extended verandah and screens
    • Additional internal fixtures
    • Off-grid solutions

Changing Places Toilet Option 2

  • 3700mm x 4800mm
  • Prefabricated Kit-Form Building
  • 1 Changing Place Restroom Facility
  • 1 Accessible Shower & toilet including back rest, grab rails
  • 1 Adjustable height change table with disposable cover
  • Automatic door with secure entry
Make an Enquiry

Resources

  • Risk Audit Checklist

  • Flood and Cyclone Resilient Guide

  • HVRA Funding Guide and Checklist

  • Design Consultation

  • Public Toilet Planning Guide and Checklist

  • Refurb vs Replace: Guide and Cost Study

  • Inspiration Lookbook

  • Changing Places Funding for Inclusive Beaches Guide

  • Education Planning Guide and Checklist

  • Automated Public Toilets

  • Changing Places Guide and Checklist

  • Changing Places Public Toilet Buildings

  • Modus vs Concrete Toilets

  • Flood-Resilient Public Toilet Checklist and Guide

  • Colours and Finishes

  • About Prefab Modular

Building Features

Frequently Asked Questions

What is a Changing Places restroom?
A Changing Places restroom is a specialised public facility designed for people who need support from one or two carers, equipped with a hoist-ready layout, an adult-sized change table, and generous circulation space that standard accessible toilets can't provide. For many families, the presence of one determines whether a destination is visitable at all.
What does the Changing Places 2 include?
The Changing Places 2 is a prefabricated kit-form building with one Changing Places restroom containing an accessible shower and toilet with backrest and grab rails, an adjustable height change table with disposable cover, and an automatic secure-entry door. Aluminium composite internals and epoxy flooring keep the space hygienic and easy to maintain.
What are the dimensions of the Changing Places 2?
The Changing Places 2 measures 3700mm x 4800mm, matching the 1C's footprint.
What sites is the Changing Places 2 best suited for?
The Changing Places 2 works across beaches, parks, urban precincts, tourist parks, golf courses, and schools. Modus has delivered Changing Places buildings in settings from national parks (Glenthorne, SA) to aquatic centres (Logan North, QLD) and neighbourhood parks (Figtree Park, NSW).
How is the Changing Places 2 different from the 1B and 1C?
Against the Changing Places 1B, the 2 adds an accessible shower on a larger footprint. It shares its dimensions and inclusions with the Changing Places 1C, with the difference being the internal layout: the 2 is accessed through the front of the building, where the 1C is accessed from the side. The right option depends on your site's orientation, approach paths, and how the building needs to sit within the landscape design.
Does the Changing Places 2 include a hoist and adult change table?
Yes. The room provides hoist coverage with space for two carers, an adjustable height adult change table with disposable cover, plus the accessible shower and supported toilet.
How is access to the facility managed?
Access runs on the MLAK master key system used for Changing Places facilities nationally, combined with an automatic door and secure entry.
Is government funding available for a Changing Places 2?
Frequently. Changing Places facilities attract dedicated state and federal funding streams, with full government funding currently available to councils with inclusive beaches. Start with the Changing Places Funding for Inclusive Beaches Guide or the broader Changing Places Guide and Checklist.
Is the Changing Places 2 compliant?
Yes. Changing Places compliant fixtures and door signage come standard, the design meets Changing Places requirements and AS 1428.1, and every building is structurally engineered for its site, cyclonic regions included. More at AS 1428.1 compliance.
What warranty does the Changing Places 2 carry?
Like every Modus building: 20 years structural warranty, 50 years design life.

Related Projects

Figtree Park project in NSW

Figtree Park, NSW

Glenthorne National Park project in SA

Glenthorne National Park, SA

Logan North Aquatic Centre project in QLD

Logan North Aquatic Centre, QLD